With increasingly stringent technical documentation requirements and continuously tight project deadlines, many construction companies are beginning to realize that traditional methods are no longer suitable. BIM is being mentioned as an inevitable solution, but the big question remains: how to implement it effectively? This video showcasing Phuc Thinh's BIM application project in construction, produced by Right Media, will provide a practical perspective through a case study successfully implemented with GreenDS.
BIM application project in construction | Green DS case study video
Customer requirements
The case study implemented by Right Media is a collaborative project with GreenDS – a pioneer in BIM consulting and implementation in Vietnam. GreenDS goes beyond simply providing tools; it focuses on the practical challenges faced by businesses, from team training to process standardization and direct support throughout each project. This approach helps businesses not only "apply BIM," but truly leverage its value in operations and management.

The role of BIM and GreenDS is clearly demonstrated as a crucial part of the success of construction projects.
belong to Phuc Thinh Construction Design and Trading Joint Stock Company
Through the BIM application project in construction with Phuc Thinh Design – Construction – Trading Corp, GreenDS aims to recreate a real-life transformation journey: from the pressures of deadlines, design errors, and legal requirements, to gradually mastering BIM in project operation.
More than just introducing a solution, the video aims to demonstrate one clear point: BIM only truly delivers value when implemented correctly and with the support of a partner who understands the industry. This is also the core message that GreenDS wants to convey to its clients – GreenDS not just provides tools, but helps businesses transform their working methods to adapt and achieve sustainable growth.
Right Media's solution
In the Case Study project in collaboration with GreenDS, Right Media acted as the full-service production unit, handling everything from concept and script to filming and editing, aiming to vividly portray Phuc Thinh's real-world BIM implementation journey. After meeting with and listening to GreenDS' requirements and desires, the Right team gradually developed ideas, concepts, and defined the approach for the video as a real-world case study, detailing the transition process and the results achieved.

Right Media creates clear, logical scripts that are highly persuasive.
The GreenDS Case Study video project script, developed by Right Media, follows a problem-solution-result sequence:
- Problem: Businesses face significant pressure from project deadlines, increasingly stringent legal requirements, and high accuracy demands in design documentation. Traditional methods based on 2D drawings reveal many limitations, particularly in design control and coordination between disciplines.
- Deployment: Phuc Thinh began implementing BIM with the support of GreenDS, gradually transitioning from outdated work methods to a synchronized 3D modeling approach. This process included team training, process standardization, and direct support in handling issues arising during the project.
- Result: The application of BIM helps businesses better control design, synchronize data, and significantly reduce errors. Especially with GreenDS's continuous support throughout the implementation, training, and practical problem-solving process, businesses not only apply BIM but also effectively leverage its value. This enhances early collision detection, reduces risks, ensures construction progress, and optimizes the overall project efficiency.
In terms of context, Right Media proposed filming live at the construction site in Dong Thap and the company's office in Ho Chi Minh City to highlight Phuc Thinh's actual implementation journey. Simultaneously, interviews with the board of directors and staff were incorporated as authentic insider perspectives, increasing credibility and further affirming the value that BIM brings in optimizing operations and ensuring project efficiency.

Right Media conducted live filming at the production site to emphasize the authenticity of the project.
In terms of post-production, for projects in the production and technology sectors, Right Media prioritizes sound processing that is subtle and restrained while still ensuring clarity and persuasiveness. Simultaneously, videos are supplemented with English voiceovers to broaden accessibility to a diverse range of clients, especially businesses interested in and exploring BIM solutions.
Right Media's workflow
Right Media's workflow is structured in a systematic and optimized way, ensuring that each project not only achieves high-quality visuals but also conveys the client's message and objectives accurately.
- Receiving and analyzing requests: Listen to the client's needs, communication goals, and industry specifics to guide content creation accordingly.
- Suggested ideas & scripts: Develop concepts, messaging, and detailed scripts based on customer insights and project goals.
- Pre-production: Production planning includes timeline, shotlist, staffing, equipment, and design elements.
- Production: Filming took place at the construction site and the main office of Phuc Thinh. For this project, the filming time was condensed into two days.
- Post-production: Film editing, color grading, sound processing, graphic enhancement, and video finalization to meet quality standards.
- Handover & Optimization: Finalize the product, make edits based on feedback, and advise on how to use the video effectively in communication.
Achievements
The BIM application project at Phuc Thinh Design – Construction – Trading Corp is highly realistic, vividly recreating the implementation process from the actual construction site to internal company operations. This highlights the effectiveness of BIM in controlling design, coordination, and ensuring project progress. GreenDS is not only a BIM tool provider but also a transformation partner, accompanying the company throughout the implementation process, helping it master the system, optimize operations, and enhance project management capabilities.

CONTACT US:
- Ho Chi Minh City: 06 Binh Quoi Street, Binh Quoi Ward, Ho Chi Minh City
- Hanoi: 105-E5, Trung Tu Street, Dong Da District, Hanoi
- Facebook: FB.com/rightmedia.vn/
- Youtube: youtube.com/@RightMediaVN
- Email: info@rightmedia.vn | anhtai@rightmedia.vn
- Hotline: 0901 391 002





