Bid portfolio: what videos, photos, and printed materials are needed?

VIETPOWER's corporate video on electrical cabinets featuring an engineer inspecting electrical cabinets.

Index

Rate this post

A bid proposal is a document demonstrating a company's ability to handle a contract. It answers four questions: production or construction capacity, quality, similar projects, and personnel. The contracting authority reads it to compare multiple suppliers simultaneously. This article focuses on the visual aspect: which videos, which photos, print or digital versions, and when an English version is needed. Examples are provided from projects Right Media has completed for VIETPOWER, Hoang Kim Precision, Golden Lotus, Doan Gia, Tanaka, and LCB Battery.

How does a tender document differ from a regular company profile?

The bid documents are read for evaluation and comparison, not for familiarization. The readers are the bid evaluation committee, consulting engineers, or the client's purchasing department. They compare each item against the tender requirements and stop where they find sufficient evidence.

A general profile opens with a cover letter and vision statement. The bid should present evidence first: certifications, capacity, similar projects. The seven-part structure of a profile is already outlined in the article. What does a company profile include?This article only discusses another aspect: how to arrange and select images when the goal is to win a bid.

The format of the official submission documents always follows the tender documents. Videos, photos, and slideshows are supplementary materials that help the contracting authority trust the paper documents.

What documents does the bidding party need to prove?

The bidding party needs to see five things: the ability to do the work, the ability to do it according to standards, previous experience with similar work, the ability to perform the work, and timely delivery. A good bid proposal includes both paper and photographic evidence for each of these points.

What needs to be proven Paper evidence Photographic evidence
Production and construction capacity List of machinery, capacity, and area The machine is running and being operated; a drone provides a panoramic view of the factory.
Quality Scanned copy of valid certificate, QC procedure Testing area, engineers inspect the product, certification is announced via video.
Experience with similar projects List of projects, value, year of completion Photos of the completed project, project introduction video, and developer's testimonial.
Human Resources Organizational chart, list of key engineers Portrait photos of the team, scenes of engineers working on site.
Progress, coordination The process from receiving to handing over. Coordination meeting scene, graphical process flow diagram.

Financial capacity is the only section that doesn't require a picture. The financial report must follow the format required in the tender documents.

Which video convinced the bidding party?

The most persuasive video is a 2-3 minute capability video that presents certifications and figures first. The bidding party watches the video to quickly verify the written documentation. The three formats below are used by Right Media's clients when bidding.

Performance videos: certifications and data right at the beginning.

VIETPOWER, a manufacturer of low-voltage switchgear, requires a video instead of a company profile when participating in tenders. The investor and consulting firm need a quick assessment of the supplier's production capabilities. The video should prioritize showcasing IEC 61439-2 and IEC 61641 certifications, as this is the information the consulting engineers look for first.

Hoang Kim Precision can use corporate videos instead of paper profiles in bidding processes. The graphics accurately show the number of machines in operation: 47 CNC milling machines, 13 CNC lathes, and 7 CNC wire cutting machines. The video also details a key customer concern: always having more than 10 backup machines ready for urgent orders.

VIETPOWER engineers inspect electrical cabinets; a scene from a film used as part of a bidding profile.

Video of the construction site and the work process.

For construction contractors, the product is the construction project and the project management approach. Golden Lotus Construction (GLC)'s corporate video was filmed over two days at the office and construction site. The commentary covers three criteria: price, schedule, and quality. The video shows GLC starting construction immediately upon receiving the bid and using BIM to digitize the construction process. The quality section discusses the 5M methodology and the PDCA cycle.

According to Right Media's company profile service page, GLC used this film in its bid proposal. Watch the Golden Lotus corporate film project..

A short introductory video can be included in the presentation.

Doan Gia works in the industrial refrigeration industry. The company needed a video showcasing its services and products to use in bidding processes. Right Media handled everything from concept, survey, and scriptwriting to filming and editing. The video was delivered in both Vietnamese and English versions.

This type of video should be short and shown at the beginning of the presentation, before the presenter goes into technical details.

Which images should be included in a bid proposal?

The photos in the bid documents must meet the evaluation criteria. These include running equipment, the QC area, the key personnel, and completed projects. Purchased illustrative photos raise suspicions about the rest of the documents.

  • The machinery is in operation and being operated by a person: More convincing than a still camera shot.
  • Testing area, QC room: The person inspecting the product can read the name on the measuring device.
  • Profiles of the key team: These are the people whose names are on the personnel list in the file.
  • Delivered work or product: We only use photos that customers have given permission to publish.
  • On-site certification: The area related to the certification is included as a scanned copy in the appendix.

Photos and videos should be taken or recorded in the same batch to ensure data and images are consistent. The bidding committee will compare everything very carefully; discrepancies in recording capacity between profiles, websites, and videos will be detected immediately.

A cameraman films a CNC machine in the Hoang Kim Precision workshop.

Print or digital: what to submit, what to bring?

The bid proposal should include both printed and PDF versions, one for each task. The printed and PDF versions should be included in the submission package. Videos and presentations should be used for clarification sessions, meetings with the client, or sent as email attachments.

Format Use when Note
Printed profile booklet Submit the paper application and bring it to meet the developer. Standard printable PDFs have margins; keep the source file for updates.
PDF screen Send an email, attaching the electronic bid documents. Small file size, under 10 MB
Video profile and QR code Print the QR code from the profile booklet and display it at the beginning of the presentation. The YouTube link is not publicly available; a full HD version is sent directly.
16:9 slideshow Presentation and clarification of documents. Arrange the text and content in the profile booklet to ensure the data matches.

Before sending the video link, please check if the tender documents accept documents in link format. If not, the video will still be usable during the presentation and in private meetings with the client.

Is an English version required for the bid documents?

This is necessary when the investor, consulting firm, or parent company of the bidding entity is a foreigner. This is a common situation when a business acts as a supplier for an FDI factory. The English version should be prepared simultaneously with the Vietnamese version; it should not be translated later.

Here are a few examples from real-world projects:

  • VIETPOWER: The English version is read aloud by a native speaker.
  • Hoang Kim Precision: Three versions in Vietnamese, English, and Japanese, sending the correct version to each partner group.
  • Tanaka Precision Vietnam: Add Japanese subtitles for use with Japanese partners and management.
  • LCB Battery: The English version is sent to foreign partners as an online company profile.

Technical terminology must be approved by the business before layout or commentary is added. Certification names, product names, and power units must be consistent across all versions.

Filming a corporate video on the LCB Battery production line.

How far in advance should I prepare my bid proposal?

It's best to start before a specific tender is announced. The time between the tender document release and the submission deadline is often insufficient for shooting, filming, and designing. According to Right Media's service website, a photo package takes about 5 days. A photo package with design takes 3–4 weeks; a package including photos, videos, and design takes 4–5 weeks.

Once the original set of documents is available, each tender only needs to have the project description and cover letter adjusted. The factory, team, and certifications sections remain unchanged, only being updated when changes occur.

Costs of preparing tender documents

Right Media offers three reference packages, applicable in Ho Chi Minh City, Binh Duong, and Dong Nai, excluding VAT. The package includes photos, videos, and design, suitable for businesses needing to bid on projects or meet with foreign partners.

Package Include Reference price
Profile picture One photoshoot at the company, 40 post-production photos. From 9,000,000 VND
Photo + profile design Photo package, content editing, 24–32 page design, printable file and PDF. From 22,000,000 VND
Photos + videos + design 1-2 days at the company, 2-3 minute video profile with drone footage (Vietnamese and English versions), 60 photos, 32-page bilingual profile. From 49,000,000 VND

Details of each package and any additional charges can be found on this page. Company profile preparation services.

Frequently Asked Questions

Can a video replace a paper company profile when submitting a bid?

The video cannot replace the official submission, as the document format is required by the bidding party. A video can replace a paper profile in other situations: presentations, document clarification sessions, and when sending to distant partners. A safer option is to print the QR code leading to the video directly in the profile booklet.

What should a new company with few projects include in its bid documents?

Showcase existing capabilities instead of lacking achievements: factory, equipment, QC processes, certifications, and engineering team. Hoang Kim Precision's film dedicates significant time to its equipment and measuring devices. FDI partners see the capabilities without needing a physical factory. The three projects clearly demonstrate capabilities far better than the client's logo.

Is it permissible to use photos of projects already completed for other clients?

Only use when the investor permits publication. Businesses should obtain written permission during acceptance testing, including the right to use the project name. For client factories, obscure sensitive information such as blueprints and orders before taking photos.

How often should a bid qualification profile be updated?

Once a year, or whenever a new certification is issued, a major new project is undertaken, or there is a leadership change, printing expired certifications in your file is a common mistake that can cost you points. Keeping the original design and image source files allows you to only need to edit the changes for subsequent updates.

Prepare your bid documents before the bidding season.

Please list the business tenders you plan to participate in next year and the required qualifications for each tender. Right Media will survey and suggest images, videos, and a layout for your tender documents that adhere to those criteria. See the tenders on this page. Business profile video production serviceor call hotline 0901 391 002. See more project information. VIETPOWER corporate film and corporate film Hoang Kim Precision.